The Cooler That Couldn’t Be Made Twice:
Last year, a client of ours launched a smart product.
They hit $1.6 million in waitlist sales, in 60 days.
They had funding, press and hype.
But they skipped the one question that matters once the cameras shut off:
Can this actually be manufactured?
[PART 1 – 0:25–1:10 | The Rise]
Before they came to us, they’d already spent $200K on an award-winning design agency.
The cooler looked like a $200 lifestyle product—Bluetooth lock, LED lighting, built-in battery.
Everything geared for a “premium outdoor experience.”
But when it came time to actually build it?
[PART 2 – 1:10–1:45 | The Fall]
The cracks started showing.
Their team deferred safety testing.
Skipped engineering validation.